Cloud Migration

Move to the Cloud Without Disrupting Your Business

We migrate legacy applications, databases, and on-premise workloads to the cloud with a phased plan, proven tooling, and rollback paths at every step.

Engineer planning a cloud migration on a laptop
0+

Migrations Completed

0

Data Loss Incidents

0%

Avg Operating Cost Reduction

0x

Faster Release Cycles Post-Move

Migration Services

Whether you are lifting a single server or re-platforming an entire estate, we tailor the strategy to your risk tolerance and goals.

Migration Readiness Assessment

Inventory of applications, dependencies, and data with a prioritized migration roadmap.

Lift & Shift (Rehost)

Fast, low-risk moves of existing workloads to cloud VMs with minimal code changes.

Re-Platforming

Swap self-managed components for managed services—databases, queues, caches—for less ops overhead.

Re-Architecting

Break monoliths into services or serverless functions to unlock cloud-native scalability.

Database Migration

Schema conversion, replication, and cutover for MySQL, PostgreSQL, SQL Server, Oracle, and NoSQL.

Post-Migration Optimization

Cost tuning, performance validation, and security hardening once workloads are live.

Migration Risks
We Manage

Migrations fail on the details—untracked dependencies, data drift, and surprise downtime. Our process is built to surface and neutralize each one.

01

Hidden Dependencies

Automated discovery and dependency mapping ensure nothing is left behind or broken on cutover.

02

Downtime During Cutover

Continuous replication and blue-green cutovers reduce switchover windows to minutes.

03

Data Integrity

Checksums, reconciliation reports, and dual-run validation confirm every record made the move.

04

Cost Surprises

Pre-migration cost modeling and post-migration right-sizing keep the new bill predictable.

05

Team Readiness

Runbooks, training, and a hypercare period ensure your team is confident operating the new environment.

Our Migration Framework

A phased, reversible approach that moves the lowest-risk workloads first and builds confidence with every wave.

Week 1–2

Discover & Assess

Catalog applications, data, integrations, and compliance constraints; score each for migration complexity.

Week 2–3

Plan & Design

Choose a strategy per workload (rehost, re-platform, re-architect), design the target environment, and model costs.

Week 3–4

Build the Landing Zone

Provision accounts, networking, security controls, and CI/CD in the target cloud using infrastructure as code.

Weeks 4–10

Migrate in Waves

Move workloads in prioritized batches with replication, testing, and go/no-go checkpoints for each wave.

Per wave

Cut Over & Validate

Switch traffic, reconcile data, and run smoke and performance tests with rollback ready.

Post-migration

Optimize & Hypercare

Monitor closely for 2–4 weeks, tune costs and performance, and hand over documentation.

Tools We Migrate With

Target Clouds

AWSMicrosoft AzureGoogle Cloud

Migration Tooling

AWS MGNAWS DMSAzure MigrateDatabase Migration Servicersync / Snowball

Databases

MySQLPostgreSQLSQL ServerOracleMongoDB

Containers

DockerECSEKSAKS

Infrastructure as Code

TerraformCloudFormationAnsible

Validation

Load testing (k6)Data reconciliation scriptsCloudWatchGrafana

Why Migrate With TedIT

We have moved marketplaces, ERPs, and customer-facing platforms to the cloud—without a single lost record.

Zero-Data-Loss Record

Reconciliation at every wave means we have never lost data in a migration.

Minimal Downtime

Replication-based cutovers keep switchover windows to minutes, often outside business hours.

Application Expertise

We are software engineers first, so we can fix code issues that surface during migration.

Clear Cost Modeling

You see the projected cloud bill before we move anything—and we tune it afterwards.

Who Should Migrate

On-Premise Businesses

Companies running aging servers with rising maintenance costs and hardware refresh cycles looming.

Teams on Legacy Hosting

Applications stuck on shared hosting or single VPS setups that cannot scale or recover from failure.

Cloud-to-Cloud Movers

Organizations consolidating providers or moving to a platform that better fits their roadmap.

Frequently Asked Questions

How long does a cloud migration take?

A single application can move in 2–4 weeks. Multi-system estates typically take 2–4 months, migrated in waves so the business keeps running throughout.

Will there be downtime?

What happens if something goes wrong?

Do you migrate databases as well as applications?

Can you modernize the application during the migration?

What does it cost?

Plan Your Migration With Confidence

Start with a free readiness assessment—we will map your systems, estimate the effort, and show you the cost of running in the cloud.